Breaking News

The City of Washington, Indiana

A City of Pride and Progress

84° Forecast

Storm Water Permitting and Construction

Indiana law requires erosion control practices to be implemented on most construction projects in the state. 327 IAC 15-5 (known as ‘Rule 5’) is a performance-based regulation designed to reduce pollutants associated with construction and/or land disturbing activities. The requirements of Rule 5 now apply to all persons who are involved in construction activity (including clearing, grading, excavation and other land disturbing activities) that results in the disturbance of one (1) acre or more of total land area. The purpose of this rule is to establish requirements for storm water discharges from construction activities so that public health, existing water uses, and aquatic life are protected.

An erosion and sediment control plan must be developed and submitted for review a minimum of 30 days prior to any land disturbing activity.

For construction activity that takes place within the city limits of Washington, contact the Washington Wastewater/Storm Water Department, 812-254-2792 to submit your plan.

For guidance on developing your plan, please visit IDEM's Storm Water Permitting website.

Contact Us

Storm Water Department
169 S 200 W
Washington, IN 47501
Get Directions

Topics of Interest